Sacramento ADU rules

Size, height, setbacks, parking, owner occupancy, permits and fees. Every line links to an official source, checked Oct 2026.

Sacramento allows two ADUs per lot, attached or detached, with an existing or proposed main home. ADUs can be rented but not sold separately.[1]

California cities can set their own ADU rules, but never stricter than state law. Grey lines show the state floor from the HCD ADU Handbook.

Size limits

Detached: up to 1,200 sq ft, and all detached ADUs on a lot together cannot exceed 1,200 sq ft (garages excluded). Attached: 50% of the main home or 850 sq ft (1,000 sq ft with 2 or more bedrooms), whichever is greater.[1]

State law: a city's maximum size must allow at least 850 sq ft, or 1,000 sq ft for more than one bedroom, and local rules cannot block an 800 sq ft ADU with 4 ft side and rear setbacks (Gov. Code 66321).[3]

Height

No city-specific figure verified. The state minimum below applies; confirm local details with the city.

State law: detached ADUs get at least 16 ft; 18 ft within a half mile walk of a major transit stop or high-quality transit corridor (plus 2 ft to match roof pitch) or on a lot with a multistory multifamily building; attached ADUs up to 25 ft or the main home's limit if lower (Gov. Code 66321).[3]

Setbacks

No city-specific figure verified. The state minimum below applies; confirm local details with the city.

State law: side and rear setbacks can be no more than 4 ft for new ADUs; converted existing space needs no new setback (Gov. Code 66314, 66323).[3]

Parking

No city-specific figure verified. The state minimum below applies; confirm local details with the city.

State law: at most 1 space per ADU or per bedroom, whichever is less, and none within a half mile walk of public transit, in a historic district, within one block of a car share, or for ADUs inside the house (Gov. Code 66314, 66322).[3]

Owner occupancy

No city-specific figure verified. The state minimum below applies; confirm local details with the city.

State law: no owner occupancy requirement for ADUs (Gov. Code 66315). A JADU requires the owner to live on site if it shares a bathroom with the main home (Gov. Code 66333).[3]

Permit steps and timeline

Planning approval, or approval for concurrent review, comes before the building permit application. Plans can be submitted electronically. Each ADU needs its own address.[1]

State law: the city must approve or deny a complete application within 60 days when there is an existing home on the lot (Gov. Code 66317).[3]

Fees

Impact fees are waived under 750 sq ft and apply at 750 sq ft and up. School district fees apply. The Building Division offers a permit fee estimate for a $164 fee (form CDD-0278).[1]

State law: no impact fees on ADUs of 750 sq ft or less; above that, impact fees must be proportional to the size of the main home. Plan check, permit and school fees can still apply.[3]

Building in Sacramento? Start a quote request

We connect you with builders who serve your area. Free, no obligation.

Sources

Every fact above links to an official city or state page. Rules change; check the source before you build.

  1. [1] City of Sacramento: ADU handout CDD-0423 (rev. Jan 29 2026) checked Oct 2026
  2. [2] City of Sacramento: Accessory Dwelling Units checked Oct 2026
  3. [3] HCD ADU Handbook (March 2026) checked Oct 2026

Related guides and builders

ADU size and height limitsSetbacks, HOAs and covenantsADU permit timelineState ADU rulesPermit and planning helpPrefab and modular ADU buildersDesign-build ADU contractorsCalifornia ADU data

← All city ADU rules

Newsletter

The Backyard Letter

One short email when we publish something new: a guide, a rule change in your state, or a public cost report worth reading. Every item links to its source. Free, unsubscribe any time.